Advanced Reporting: Available Data

TL;DR

Advanced reporting uses two data models: Wrike Core and Utilization and PerformanceWrike Core focuses on workspace data like projects, tasks, folders, custom fields, timelogs, status history, effort, and financial data. Utilization and Performance focuses on user-based capacity data like work schedules, timelogs, effort, booked effort, and allocation. You can build reports from either model, but you can’t combine fields from both in one widget.

Table 35. Availability

Availability: Pinnacle, Apex.; Unavailability: Free, Team, Business;

Overview

Analytic boards are built over a data models that contains key Wrike workspace entities and building blocks, such as spaces, folders, tasks, timelogs, users, and history of status changes.

You can visualize or filter any attribute of any entity. Entities are already connected to each other behind the scenes, so you can build boards that span multiple entities, without specifying relations between entities. However, not all the entities are available within the same data model.

There are two data models available for analytics reports: Wrike Core and Utilization and Performance. Each of these models has a unique set of data tables with different data availability. It is not possible to use fields from different data models in one widget.

Wrike Core Data Model

Wrike Core data model is based on projects: it has security rules that show users only the data shared with them, and it exports most of the folder/project/task attributes.

Click here to see the full available data model.

Note

Some of these fields might not be enabled by default in your account. Please, contact our Support team for more details on how to enable them.

The table below contains all the available data for widgets based on the Wrike Core data model:

Field Name Description Type
Project All projects shared with current user
Project ID ID of the project, as seen in workspace Numeric
Project Name Name of the project String
Project Creation Date Date when the project was created Date
Project Completion Date Date when project status was changed into Completed Status Group. Empty if the project is in any status from the Active, Deferred or Canceled Status Groups Date
Project Start Date Planned project start date Date
Project Due Date Planned project due date Date
Project Status Status of the project String
Project Status (Color) Status of the project combined with its color representation. Use this field in Pie, Bar, Pivot and other charts to make the color match the workspace color of the status String
Project Status Group Status Group of the selected project status. Can be one of Active, Completed, Deferred or Canceled groups. String
Project Workflow Workflow applied to the selected project String
Project Author User who created the project String
Project Link Link to the project view in workspace String
Project Item Type Available custom item types and 'project' for regular projects String
Project Owner Users, assigned as project owners
Project Owner ID ID of user who is the project owner Numeric
Project Owner Project owner’s name String
Folder All folders and Spaces shared with current user
Folder ID ID of the folder/space, as seen in workspace Numeric
Folder Name Name of the folder String
Folder/Project Custom Field Folders/projects/Spaces custom field values*
Folder/Project Custom Field ID Numeric ID of the custom field Numeric
Folder/Project Custom Field Name Name of the custom field String
Folder/Project Custom Field Name (ID) Name of the custom field and ID. It's used to distinguish between custom fields with the same name String
Folder/Project Custom Field Type Type of custom field. Can be one of Text, Enumeration* (Single select), Numeric* (Number), Date, Boolean* (Checkbox), Money* (Currency), Percent* (Percent), Duration, People, Multiselect* (Multiple select) String
Folder/Project Custom Field Any Value Value of the field in string format, always filled in String
Folder/Project Custom Field Date Value Date value of the custom field. Only filled in if the data type is Date Date
Folder/Project Custom Field Text Value String value of the field. Only filled in if the custom field type is Text, Enumeration* (Single select) or Multiselect* (Multiple select) String
Folder/Project Custom Field Numeric Value Numeric value of the custom field. Only filled in if the custom field type is Numeric* (Number), Money* (Currency) or Percent* (Percent), Duration or type is Enumeration* (Single select), Multiselect* (Multiple select) and values are numeric Numeric
Folder/Project Custom Field Checkbox Value Checkbox value - true or false. Only filled in if type is Boolean* (Checkbox) Boolean
Folder/Project Custom Field User Value Name of the user, only filled in if the custom field type is People String
Task All tasks shared with current user. Tasks from projects or folders not shared with the user will not be shown
Task ID ID of the task Numeric
Task Name Name of the task String
Task Creation Date Date when the task was created Date
Task Start Date Planned start date of the task Date
Task Due Date Planned due date of the task Date
Task Completion Date Date when task status was changed into any status from the Completed, Deferred or Canceled Status Groups. Empty if the task is in any status from the Active Status Group Date
Task Status Status of the task String
Task Status (Color) Status of the task combined with its color representation. Use this field in Pie, Bar, Pivot and other charts to make the color match the workspace color of the status String
Task Status Group Status Group of the task status. Can be one of Active, Completed, Deferred, Canceled groups String
Task Workflow Workflow of the status assigned to a task String
Task Duration (days) Duration of the task in days Numeric
Task Author User who created the task String
Task Importance Importance of the task. Can be High, Normal or Low String
Task Link Link to the task view in workspace String
Task Effort Mode Possible options: None, FullTime, Basic, Flexible String
Task Effort (minutes) Effort of the task in minutes Numeric
Task Billing Type Task billing type (Billable/Non-billable) String
Ignore Excluded Days Shows if weekends and holidays are ignored when calculating task duration Boolean
Task Item Type Available custom item types and 'task' for regular tasks String
Task Assignee Assignees of tasks
Task Assignee ID ID of the user who is task assignee Numeric
Task Assignee Name of task assignee String
Task Assignee Job Role Initials Job role initials of the assignee String
Task Assignee Job Role Title Job role title of the assignee String
Task Custom Field Custom field values of a task*
Task Custom Field ID Numeric ID of the custom field Numeric
Task Custom Field Name Name of the custom field String
Task Custom Field Name (ID) Name of the custom field and ID. It's used to distinguish between custom fields with the same name String
Task Custom Field Type Type of the custom field. Can be one of Text, Enumeration* (Single select), Numeric* (Number), Boolean* (Checkbox), Money* (Currency), Percent* (Percent), Date, Duration, People, Checkbox, Contacts, Multiselect* (Multiple select) String
Task Custom Field Any Value Value of the custom field in string format, always filled in String
Task Custom Field Date Value Date value of the custom field. Only filled in if the custom field type is Date Date
Task Custom Field Text Value String value of the field. Only filled in if the custom field type is Text, Enumeration* (Single select) or Multiselect* (Multiple select) String
Task Custom Field Numeric Value Numeric value of the field. Only filled in if the custom field type is Numeric* (Number), Money* (Currency) or Percent* (Percent), Duration or type is Enumeration* (Single select), Multiselect* (Multiple select) and values are numeric Numeric
Task Custom Field Checkbox Value Checkbox value - true or false. Only filled in if type is Boolean* (Checkbox) Boolean
Task Custom Field User Value User Name, only filled in if the custom field type is People String
Task Attributes in Folder/Project Attributes of tasks relative to its folders/projects
Task Depth Level Depth level of task within the project. 1 will pull parent tasks; subtasks will have the depth level of 2; sub-subtasks - depth level 3, etc. Numeric
Timelog Timelog entries
Timelog User ID ID of the user who logged time Numeric
Timelog User Name Name of the user who logged time String
Timelog Creation Date The timelog entry was created for this date Date
Timelog Time Spent (minutes) Time spent in minutes Numeric
Include Data From Top-level filter used to present information from only certain spaces/folders. Typically such filter is applied based on the Space/folder selected when creating an analytics board
Include Data From Name Name of folder/project/space that limits information displayed in the analytics board String
Include Data From Name (ID) Name of folder/project/space that limits information displayed in the analytics board, along with its ID. It is used to distinguish folders with the same name String
Include Data From Depth Level Include Data From Depth Level = 1 will include the selected source and all its child locations, Depth Level = 2 - exclude the selected source and include only its child locations, etc. Numeric
Task Status Change History History of the task status change. It includes the current/previous task status and time spent in the previous status before the change
Task Status Change History User Name User who made the change String
Task Status Change History Previous Change Date Date when the status of the task was changed to the previous one. If there was no previous change, this equals to task creation date Date
Task Status Change History Change Date Date when the change was made or the current date/time, if last task status is from the Active Status Group Date
Task Status Change History Old Status Status value before the change String
Task Status Change History Old Status Ordered Status value before the change. Statuses are shown in the same order as they are in the workflow itself. It is useful for seeing status changes within one workflow String
Task Status Change History Old Status Ordered (Color) Status value before the change. Statuses are shown in the same order as they are in the workflow itself, with its color representation. It is useful for seeing status changes within one workflow. Use this field in Pie, Bar, Pivot and other charts to make the color match the workspace color of the status String
Task Status Change History New Status

Status value after the change

Note

Latest New status is always marked as N/A if an item is in an active status and the transition change date equals current day.

String
Task Status Change History New Status Ordered Status value after the change. Statuses are shown in the same order as they are in the workflow itself String
Task Status Change History New Status Ordered (Color) Status value after the change. Statuses are shown in the same order as they are in the workflow itself, with its color representation. It is useful for seeing status changes within one workflow. Use this field in Pie, Bar, Pivot and other charts to make the color match the workspace color of the status String
Task Status Change History Time Spent (minutes) Amount of time task spent in the previous status prior to the change, in minutes Numeric
Project Status Change History History of the project status change. It includes the current/previous project status and time spent in the previous status before the change
Project Status Change History User Name User who made the change String
Project Status Change History Previous Change Date Date when the status of the project was changed to the previous one. If there was no previous change, this equals to project creation date Date
Project Status Change History Change Date Date when the change was made or the current date/time, if last project status is from the Active Status Group Date
Project Status Change History Old Status Status value before the change String
Project Status Change History Old Status Ordered Status value before the change. Statuses are shown in the same order as they are in the workflow itself. It is useful for seeing status changes within one workflow String
Project Status Change History Old Status Ordered (Color) Status value before the change. Statuses are shown in the same order as they are in the workflow itself, with its color representation. It is useful for seeing status changes within one workflow. Use this field in Pie, Bar, Pivot and other charts to make the color match the workspace color of the status String
Project Status Change History New Status

Status value after the change

Note

Latest New status is always marked as N/A if an item is in an active status and the transition change date equals current day.

String
Project Status Change History New Status Ordered Status value after the change. Statuses are shown in the same order as they are in the workflow itself. String
Project Status Change History New Status Ordered (Color) Status value before the change. Statuses are shown in the same order as they are in the workflow itself, with its color representation. It is useful for seeing status changes within one workflow. Use this field in Pie, Bar, Pivot and other charts to make the color match the workspace color of the status String
Project Status Change History Time Spent (minutes) Amount of time project spent in the previous status prior to the change, in minutes Numeric
Sharing Service table
Account ID Service field Numeric
Folder/Project ID Service field Numeric
User ID Service field Numeric
Sharing for Include Data From Service table
Account ID Service field Numeric
Folder/Project ID Service field Numeric
User ID Service field Numeric
Project Booked Effort Project bookings calculated for specific dates, users, and project
Booked Effort Assignee Name of the user who booked project effort String
Booked Effort Assignee Job Role Initials Job role initials of the user who booked project effort String
Booked Effort Assignee Job Role Title Job role title of the user who booked project effort String
Booked Effort Date Date of the booked effort Date
Booked Effort (minutes) Booked effort of the project in minutes, calculated for the specific date, user, and project Numeric
Booked Effort Mode Options: Basic, Flexible String
Task Effort Task effort, calculated for specified dates, task assignee and task
Assignee Effort Date Date of the effort Date
Assignee Task Effort (minutes) Task effort of the task in minutes, calculated for the specific date, assignee, and task Numeric
Project Budget Budget of the project. Visible only to users with access to financial fields
Project Budget Budget of the project, if specified Numeric
Actual Cost and Fees Cost and fees for specific (billable) tasks, users, and dates, based on actual rates and logged time. Visible only to users with access to financial fields
Actual Cost User time spent × user cost rate Numeric
Actual Fees User time spent × user bill rate Numeric
Planned Cost and Fees Cost and fees for specific (billable) tasks, users and dates, based on actual rates and task effort. Visible only to users with access to financial fields
Planned Cost User task effort × user cost rate Numeric
Planned Fees User task effort × user bill rate Numeric

Note

Duration custom field values in hours are translated into and shown as minutes on analytical boards for consistency in data representation.

Utilization and Performance Data Model

Utilization and Performance data model is based on users: it doesn't show any descriptive project data, but it contains all the time allocated/ tracked in the account and is the best source for capacity planning.

The table below contains all the available data for widgets based on the Utilization and Performance data model:

Field Name Description Type
User Work Schedule Information about users and their work schedule each day for the last 365 days
User ID ID of the user Numeric
User Name Name of the user String
User Name (ID) Name of the user along with their ID. This is used to distinguish users with the same name. String
User Role Role of the user String
User Email Address Email address of the user String
User Service Field

Service field, equals 0. Use this field as an additional term in formulas to show users without Timelog/Effort entries in results.

Example: [Total User Work Schedule Working Hours] + [Total User Service Field].

Numeric
User Work Schedule Date Date of schedule. This shows the schedule dates for each user from when they were added to the account until they were deleted from the account. The maximum number of days is 365. Date
User Work Schedule Week Day Day of the week (0 for Sunday, 1 for Monday, etc.) Numeric
User Work Schedule Working Hours The number of working hours for the specified date. Numeric
User Job Role Initials Job role initials of the user String
User Job Role Title Job role title of the user String
User Work Schedule Name Name of the schedule that is assigned to the user String
User Work Schedule Workday An indicator of whether a date is scheduled as a workday in the users' work schedule. The values are true or false. Boolean
User Work Schedule Change Type An event that causes a workday change (ex. PTO, overtime, public holidays) String
User Work Schedule Change Comment A comment on the workday change String
Task All tasks with an Effort or Timelog entry
Task ID ID of the task Numeric
Task Link Link to the Task view in the workspace String
Timelog Timelog entries
Timelog User ID ID of the user who logged time Numeric
Timelog User Name Name of the user who logged time String
Timelog Date The timelog was created for this date Date
Timelog Time Spent (minutes) Time spent in minutes Numeric
Effort Task Effort, calculated for specified dates and users, for the last 365 days
Effort Date Date of the effort Date
Task Effort (minutes) Effort of the task in minutes, calculated for the specified date and user Numeric
Task Effort Mode Options: None, FullTime, Basic, Flexible String
Sharing for User Service table
Account ID Service field Numeric
Project Booked Effort Project bookings calculated for specific dates, users, and project
Booked Effort Date Date of the booked effort Date
Booked Effort (minutes) Booked effort of the project in minutes, calculated for the specific date, user, and project Numeric
Booked Effort Project ID ID of the project with the booked effort Numeric
Booked Effort Project Link Link to the project with the booked effort String
Booked Effort Mode Options: Basic, Flexible String
User Allocation Total allocated effort as summarized in the Workload chart that takes into consideration task effort and project booked effort
User Total Allocation Effort (minutes) The total allocated effort of the user per day Numeric