Locking Task Details
I'd like to request that the task details get locked at the top of the task window, so that when scrolling down the audit trail, they are always visible.
Once an audit trail on a specific task gets lengthy, to get to the task details, the scrolling can become cumbersome.
Thanks
Hey Josh!
Would you want the description to be locked too or just the two bars above that? The description could get lengthy as well which could leave very little space to scroll the stream beneath it.
What would be great is to have the option to do either/or or both!!
We've got a lot of tasks where the description isn't that long, but I appreciate there are some where they are and would vary from company to company. Which is why the option on both would be more useful