Ability to set *project* end date based on duration
I would like to have the ability to set the end date of a Project based on the duration (# of days) from the start date (like you can with tasks).
Some of our spaces utilize only projects with no sub-tasks, usually as "leads" for sales. I'd like to be able to set a duration to the project end based on when the quote is submitted (i.e. 14 days) to show when to follow up.
We don't want to use sub-tasks on these because it creates too much work/too many lines, and if the quote is accepted, the project is moved to production where they add their own sub-tasks as needed.
Is this something that could be looked at as an added feature?